hotel entrance drive restoration Augusta Ga
starting prep work
prep finished
after filling voids with quick setting
modified urethane polymer and aggregate
repair artist engraving identical imprint
continued
finished masterpiece
ready for painting
Thursday, March 1, 2012
15 ft x 25 ft x 12 in deep depression traffic ready in 8 hours
depression is wet at 9:00 a.m.
we start drying process
torches complete drying at 11:00
major cracks and voids are filled to seal moisturebelow grade 12:00
surface is trowelled and aggregate is added to surface
\
completed by 6:30 and ready for heavy equipment
by 7:30
we start drying process
torches complete drying at 11:00
major cracks and voids are filled to seal moisturebelow grade 12:00
surface is trowelled and aggregate is added to surface
\
completed by 6:30 and ready for heavy equipment
by 7:30